Page Banner

Proposed 2022 Florida Ongoing Data Requirements Annual Report

Document Type: 
Report
Author Name: 
Elizabeth Rogers

On May 31, 2022, pursuant to the ongoing data requirements of the U. S. Environmental Protection Agency’s (EPA's) Data Requirements Rule (DRR) in 40 CFR 51.1205, the Florida Department of Environmental Protection (Department) submitted a proposed annual report to EPA for the areas around two DRR-applicable sources in Florida that EPA designated "Attainment/Unclassifiable" for the 2010 one-hour sulfur dioxide (SO2) National Ambient Air Quality Standard (NAAQS) based on modeling of actual SO2 emissions. The two sources subject to the ongoing data requirements are:

  • Jacksonville Electric Authority’s (JEA's) Northside Generating Station/St. Johns River Power Park (NGS/SJRPP); and
  • WestRock CP, LLC’s Fernandina Beach Mill (WestRock)

The DRR requires that these areas be reviewed annually to document the annual SO2 emissions of each applicable source in each such area and determine whether additional modeling is needed to characterize the air quality in any area.

The annual report documents SO2 emissions decreases for both areas.

For additional information, please contact Elizabeth Rogers.

Share:          
Last Modified:
May 31, 2022 - 2:53pm

Some content on this site is saved in an alternative format. The following icons link to free Reader/Viewer software:
PDF: | Word: | Excel: