Performance Criteria Flow Chart

Document
Document: 
Document Type: 
Infographic

This flow chart describes the path an ERP applicant should take in determining the performance standard that applies to their project. The applicant should start by determining their predevelopment loading leaving the site at the time of application. Then they should determine if their project is for redevelopment and what percent reductions would be required based on the site's location in relation to an impaired water or OFW. Once the percent reduction has been determined and the reduction needed to meet the predevelopment condition is determined, the two shall be compared. The more stringent and protective reduction shall be what is required for the project.