Crystal River Energy Complex/Citrus Combined Cycle Plant

General Information

Title Information
Licensee Duke Energy Florida, LLC
Certification #                                      PA 77-09
Date Certified CREC Units 4 and 5 - 11/21/1978; CREC Unit 3 Uprate - 08/28/2008 (decommissioned in 2014); CCCP Units 1 & 2 - 05/05/2015
Description The site certification includes two nominal 700 MW fossil fuel-fired units (CREC Units 4 and 5); one nuclear unit (CREC Unit 3) which has been retired; two natural gas-fired combined cycle units (CCCP Units 1 and 2) each with a nominal 820 MW; and associated support facilities.
Fuel Type Coal/Natural Gas/Oil
Nominal Rating 1,400 MW (CREC Units 4 and 5); 1,640 MW (CCCP Units 1 and 2)
Address/Location 15760 W. Power Line Street
Crystal River, FL 34428
County Citrus
Districts Florida Department of Environmental Protection Southwest District
Southwest Florida Water Management District


Facility State Documents

Facility Document(s) Description
Conditions of Certification                 Facility License
Post-Certification Submittal Summary (CREC)
Post-Certification Submittal Summary (CCCP)
Summary of Submittals Required by Conditions
Modifications Final Orders Modifying the Conditions
Amendments Amendment Approval Letters
Final Order(s) Original Final Order of Certification and, if applicable, Land Use Consistency
Site Certification Application Original and Supplemental Facility Application(s)


Department Permits under Federal Programs

Program Permit Type Facility ID#
Air Construction and Operation 0170004 *
Water NPDES 0036366 * (CREC)
0000159 * (CCCP)

(*copy the id # and paste into the Facility ID field to locate associated permits)

Last Modified:
October 10, 2023 - 1:03pm

Some content on this site is saved in an alternative format. The following icons link to free Reader/Viewer software:
PDF: | Word: | Excel: