Page Banner

Search


Did you mean
list does

Search results

  1. Power Plant Siting Act

    others. Certification does not include licenses required by the federal ... The application, with the appropriate fee, must be submitted to DEP's Siting ... districts and bureaus, must be submitted to DEP's Siting Coordination ...

    Seiler_A - 07/08/2024 - 8:17am

  2. Storage Tank System Equipment Registration

    must be renewed every five years. DEP does not specifically endorse any ... and piping tightness and pressure testing methods must be registered ... with the department under this subsection must be renewed by the equipment ...

    Curran_K - 05/08/2024 - 1:08pm

  3. SOP Site Manager Closure Guide

    concentrations of contaminants in soil must be less than leachability-based soil ... Engineering controls must be maintained by the Site Owner following site ... (LNFA) (see LSSI SOP) To qualify for a LSSI NFA, it must be demonstrated ...

    Wright_B - 05/23/2023 - 9:23am

  4. Domestic Wastewater Collection/Transmission System Permitting

    and structures. How does one apply for a collection/transmission permit? Permits ... documents must be submitted for both a general and individual permit prior ... Collection/transmission systems not meeting the general permit criteria must submit ...

    Agosto_A - 07/07/2023 - 2:31pm

  5. Pharmaceutical Waste Management for Businesses and Homeowners

    operating in Florida must notify DEP using the 8700-12 federal form. Subpart ... P for the management of its hazardous waste pharmaceuticals. These facilities must also must notify DEP using the 8700-12 federal form  and comply with all required ...

    Noland_T - 10/18/2024 - 10:53am

  6. Reuse Feasibility

    permits issued to CUP holders must be consistent with the reuse requirements contained in the CUP; the reuse requirements contained in the CUP must be consistent with DEP rules; and the permitted facility must be located in, serve ...

    Agosto_A - 05/08/2024 - 3:09pm

  7. Release of Reservation Application Information

    (Board of Trustees). The application and supporting documents must ... of the Board of Education Deeds, applications must be submitted to the Florida ... application type must be submitted to DEP with the following: A legible copy ...

    Richardson_WB - 01/19/2023 - 2:14pm

  8. Industrial Activity (MSGP) FAQ

    the facility must ensure the Stormwater Pollution Prevention Plan (SWPPP) has ... F.A.C.). Facilities must file a new NOI to renew coverage at least two days ... is considered a monitoring requirement; however, it does not require the sample ...

    Bull_M - 08/14/2023 - 3:15pm

  9. SOP- 8. Contractor Assignment and Selection Process

    If a scope is > $325,000 and does not qualify for assignment under ... construction must include 1 quarter of operation & maintenance (O&M). Scopes of work for source removal must include necessary resurfacing ...

    Wright_B - 05/23/2023 - 9:22am

  10. Additional Funding Resources

    funds, facilities must provide public access to pump out equipment.  ... businesses. Funds appropriated to the program must be reinvested and maintained ... these funds, applicants must be an entrepreneur or small business with less ...

    Cruz_L - 10/05/2023 - 10:00am

Pages

Some content on this site is saved in an alternative format. The following icons link to free Reader/Viewer software:
PDF: | Word: | Excel: