Page Banner

Search


Did you mean
list does

Search results

  1. St. Andrews Aquatic Preserve

    is unknown at this time. The location of major beds must be determined before ...

    Hanson_K - 08/23/2024 - 9:57am

  2. Rights-of-Way and Eminent Domain

    as long as it does not interfere with safe operation of the line. Golf ... authorizes a utility to acquire a right-of-way even though the owner does ... must first establish a need for the new facility. Then the utility must ...

    Seiler_A - 07/08/2024 - 8:17am

  3. Summary of Hazardous Waste Regulations

    or the environment. A hazardous waste determination must be made of any waste material generated (262.11). If the material is hazardous, then it must be recycled, ... Restrictions (LDR). As of May 8, 1990, most hazardous wastes must be treated ...

    Gregg_J - 08/12/2024 - 1:04pm

  4. The Hourly Rate of Pay for Grant Reimbursement Guide

    will spend doing the corresponding task. The program does not cover full-time ... directly with the pumpout equipment. What does “Position Title” mean? ... as a maintenance and repair worker. All employees listed must be on the facility’s ...

    Leonard_B - 08/16/2024 - 8:29am

  5. FAQ: Use of State-Owned Land

    of an upland. What does TIITF stand for? TIITF is short for Board of Trustees ... that holds title to state-owned lands in Florida. Must I pay a fee to use state lands? This depends on the applicant and the proposed use. Fees must ...

    Norton_K - 03/14/2024 - 12:34pm

  6. State 404 Program Frequently Asked Questions (FAQ) and Answers

    Agency (EPA) and must be used to review all State 404 Program permits. ... modifications resulting from the 404 Program review. This does not change ... to Complete.” Does an applicant need to have the State 404 Program review and ERP ...

    Eckstein_Z - 02/21/2023 - 3:00pm

  7. SOP- 9. Site Access (including Off-Site Access, State Owned Lands and CSX Access)

    as provided by the applicable county property appraiser. If the owner does ... and ATC must review the additional requirement on Exhibit B attached ... to rehabilitation of this facility? If "Yes," the Site Manager must take ...

    Wright_B - 05/23/2023 - 9:22am

  8. Septic Tank Contractor Registration

    Packet. Applications must include a completed DEP Form 4105 Application for Master Septic ... to practice the profession and does not constitute grounds for denial ... septic tank contracting activities must be conducted under the name ...

    Ursin_E - 10/08/2024 - 8:20am

  9. Transmission Line Siting Act

    may not apply; however, this does not relieve the utility from ... and divisions must participate, remain the same. The time provided ... hundred miles long, many alternates can be proposed and must be reviewed. ...

    Seiler_A - 12/15/2023 - 4:30pm

  10. SOP- 23. Legal Notes

    All orders must contain this language but any correspondence in which the DEP makes a decision that affects someone’s substantial interests must ... decision of DEP. If the notification or order does not include the point ...

    Wright_B - 05/23/2023 - 9:23am

Pages

Some content on this site is saved in an alternative format. The following icons link to free Reader/Viewer software:
PDF: | Word: | Excel: