This webpage provides information and links to forms used by the environmental resource permitting (ERP) program and State 404 program. Mines require an ERP unless they are specifically grandfathered under Chapter 373.414(15), Florida Statutes (F.S.) or are exempt. ERPs are required for stormwater management systems associated with projects that involve dredging or filling and/or work done in, on, or over other surface waters (
The Peace River begins near Interstate 4, midway between Tampa and Orlando, where waters of the Green Swamp join waters of Saddle Creek.
The Integrated Habitat Network (IHN) plan is the focus for the reclamation and permitting efforts for phosphate mining in Central Florida. The IHN is based on a regional conceptual plan that outlines guiding principles for the design of reclamation in the entire phosphate-mining district (approximately 1.3 million acres of land).
A formal determination (FD) is a legally binding determination by the agency of the landward extent (boundaries) of wetlands and other surface waters as defined by Chapter 62-340, Florida Administrative Code (F.A.C.).
Mining And Mitigation Program Mailing Address
Interested in subscribing to DEP newsletters or receiving DEP updates through email?
Sign UpThe Florida Department of Environmental Protection is the state’s lead agency for environmental management and stewardship – protecting our air, water and land. The vision of the Florida Department of Environmental Protection is to create strong community partnerships, safeguard Florida’s natural resources and enhance its ecosystems.
Learn More