Page Banner

2024 Florida Ongoing Data Requirements Final Annual Report

Document Type: 
Report
Author Name: 
Terri Long

On October 9, 2024, the Environmental Protection Agency approved the  2024 Florida Ongoing Data Requirements Final Annual Report.

On June 12, 2024, pursuant to the ongoing data requirements of the EPA's DRR in 40 CFR 51.1205, the department submitted the final annual report to EPA for the areas around two DRR-applicable sources in Florida that EPA designated "Attainment/Unclassifiable" for the 2010 one-hour sulfur dioxide (SO2) National Ambient Air Quality Standard (NAAQS) based on modeling of actual SO2 emissions. The two sources subject to the ongoing data requirements are:

  • Jacksonville Electric Authority’s (JEA's) Northside Generating Station.
  • WestRock CP, LLC’s Fernandina Beach Mill (WestRock).

The DRR requires that these areas be reviewed annually to document the annual SO2 emissions of each applicable source in each such area and determine whether additional modeling is needed to characterize the air quality in any area.

For additional information, please contact Elizabeth Rogers.

Last Modified:
October 23, 2024 - 10:41am

Some content on this site is saved in an alternative format. The following icons link to free Reader/Viewer software:
PDF: | Word: | Excel: