Assessment Guidance
- Home
- Divisions
- Division of Waste Management
- Petroleum Restoration Program
- Assessment Guidance
Petroleum-Restoration Quick links
- Petroleum Restoration Program
- PRP Contacts
- Announcements & Upcoming Events
- Administrative Guidance
- Agency Term Contracts (ATC)
- Assessment Guidance
- Competitive Procurement System
- Database Reports & Site Files
- General Technical Guidance
- Innovative Technology Acceptance Program
- Monthly Dashboard Update
- Petroleum Cleanup Programs
- Presentations & Brochures
- Priority Score Funding Threshold History
- Procedures & Guidance Documents
- Qualified Contractor Information
- Related Links
- Remediation Guidance
- Rules and Statutes
- SOP
- Templates, Forms, Tools and Guidance
- Webpage Updates History
- Weekly Encumbrance Approval
- All Petroleum-Restoration content
Scroll for More Quick Links
Assessment
- Restatement of Memo Sept. 25, 2000 - Amending Guidance for Amended & Restated Agency Term Contracts and Protocols for Contractor Damage to Petroleum Storage Systems and Utilities (December 16, 2016)
- Performance Standards for State Funded Investigations Near Petroleum Storage Systems and Utilities (December 16, 2016)
- Some Points to Consider During Evaluation of Analytical Data (April 09, 1996)
- Interim Guidance for Lab Analyses of Soil Samples for Petroleum Contamination Site Assessments (February 03, 1998)
- Monitoring Well Construction Guidance Memo (August 16, 1993)
- Standard Operating Procedures PCS-003 - Complete Streamlined Assessment Procedures for Inland Protection Trust Funded Sites (September 01, 2001)
- Standard Operating Procedures PCS-004: Soil Sampling and Sampling Methods (October 01, 1991)
- Standard Operating Procedures PCS-005 - Groundwater Sampling Standard Operating Procedures Variances and Clarifications for Petroleum Restoration Program Sites (May 02, 2005)
- Closure Sampling Clarification Memorandum (January 12, 2022)
- Standard Operating Procedures PCS-006 - Design, Installation, and Placement of Monitoring Wells (May 02, 2005)
- Limited Contamination Assessment Report (LCAR) Preparation Guidance (July 01, 2020)
- Guidance on Site Assessment Report Preparation (November 15, 1998)
- Pre-drilling/Direct Push Technology Scope of Work Site Meeting - (Memorandum December 4, 2017)
- Guidance for Implementation of Pre-Drilling/Direct Push Technology Scope of Work Meeting (May 15, 2018)
- Guidelines for Assessment and Source Removal of Petroleum Contaminated Soil - May 1998
Flowcharts
- Groundwater Sampling (GAG and KAG Discharges) (October 2000)
- Soil Sampling (GAG and KAG Discharges) (October 2000)
- Groundwater Sampling (Used Oil Discharges) (October 2000)
- Soil Sampling (Used Oil Discharges) (October 2000)
- Pretreatment Soil Sampling (October 2000)
Assessment Forms
- Template Site Assessment Report (TSAR) (December 15, 2014)
- Site Assessment Summary and Worksheet (for Site Managers) (August 06, 2006)
- Site Assessment Summary Worksheet (for LSAs and LSSIs) (March 16, 2017)
- Historical Site Summary (March 17, 2017)
- Soil and Groundwater Analytical Tables
- Benzo (a) Pyrene Equivalents Conversion Table for One Sample (November 26, 2007)
- Benzo (a) Pyrene Equivalents Conversion Table for Multiple Samples (January 20, 2016)
- Boring Log
- New Well Construction Log (February 9, 2015)
- Groundwater Sampling Log (January 24, 2017)
- Guidance (March 9, 2015)
- Receptor Survey and Exposure Pathway Identification Form (February 5, 2018)
- Chain of Custody Record (June 12, 2013)
- Field Inspection Summary Form (June 07, 2004)
- Guidance for Field Instrument Calibration Log
- Field Instrument Calibration Log - Print Version (January 2002)
- Field Instrument Calibration Log - Fillable Form (January 2002)