Remediation Guidance
- Home
- Divisions
- Division of Waste Management
- Petroleum Restoration Program
- Remediation Guidance
Petroleum-Restoration Quick links
- Petroleum Restoration Program
- PRP Contacts
- Announcements & Upcoming Events
- Administrative Guidance
- Agency Term Contracts (ATC)
- Assessment Guidance
- Competitive Procurement System
- Database Reports & Site Files
- General Technical Guidance
- Innovative Technology Acceptance Program
- Monthly Dashboard Update
- Petroleum Cleanup Programs
- Presentations & Brochures
- Priority Score Funding Threshold History
- Procedures & Guidance Documents
- Qualified Contractor Information
- Related Links
- Remediation Guidance
- Rules and Statutes
- SOP
- Templates, Forms, Tools and Guidance
- Webpage Updates History
- Weekly Encumbrance Approval
- All Petroleum-Restoration content
Scroll for More Quick Links
Remediation
- RAP Checklist (February 03, 2004)
- RAP Checklist-Guidance (July 11, 2025)
- BPSS-1 Non-Petroleum Contamination at Petroleum Contaminated Sites (May 01, 2008)
- BPSS-2 In Situ Sparging, Pilot Studies, Design Requirements (May 01, 2008)
- BPSS-3 Design Requirements and Procedures for NPDES Discharges (May 01, 2008)
- BPSS-4 Vacuum Extraction, Multi-Phase Extraction, Pilot Studies, Air Emissions Treatment and Monitoring Requirements (May 10, 2000)
- BPSS-5 Record Drawings (June 04, 1998)
- BPSS-6 Modifications to Approved RAPs (May 01, 1998)
- BPSS-7 Administrative Procedures (May 01, 1998)
- BPSS-8 Effluent Disposal via Injection Well (June 08, 2000)
- BPSS-9 PE Certification Requirements (May 01, 1998)
- BPSS-10 In Situ Chemical Additives (March 04, 2011)
- BPSS-11 Natural Attenuation Evaluation Procedures (May 08, 1998)
- BPSS-12 Pilot Test Guidelines for Pre-Approval Program RAI Sites (February 03, 2004)
- BPSS-12A In-Situ Air Sparging Pilot Test Guidance (September 02, 2003)
- BPSS-12B Soil Vapor Extraction Pilot Test Guidance (September 02, 2003)
- BPSS-12C Biosparging Pilot Test Guidance (September 02, 2003)
- BPSS-12D Multi-Phase Extraction Pilot Test Guidance (September 02, 2003)
- BPSS-12E Bioventing Pilot Test Guidance (September 02, 2003)
- BPSS-12F Groundwater Recovery Guidance (January 30, 2004)
- Free Product Recovery Initiative (Revised May 23, 2017)
- Indoor Vapor Intrusion (IVI) Guidance
- The PRP’s Indoor Vapor Intrusion guidance is to be considered a draft document, for review and information only. The PRP is currently evaluating the default assumptions used in the preparation of VI action levels for petroleum constituents.
- Generic Permit for Short Term Discharges from Petroleum Contaminated Sites, Supplemental Procedural Guidance (June 23, 2004)
- Procedures for Evaluating the Cleanup Strategy on Complex, Difficult, or Costly Petroleum Remediation Sites in the Preapproval Program (May 21, 2003)
- Project Managers Guide – Remediation System Runtime Evaluation (July 18, 2008)
- PRP RA Summary Report (July 18, 2008)
- Memorandum of Understanding with DOT Regarding Petroleum Cleanup and Right of Way (October 29, 2012)
- Technical Protocol for Evaluating Natural Attenuation Parameters at Sites with Petroleum Contaminated Groundwater - January 2018 (Updated March 7, 2018)
- Institutional Controls Procedures Guidance (ICPG)
- Closure Sampling Guidelines for Groundwater Memorandum (January 27, 2014)
- Closure Sampling Clarification Memorandum (January 12, 2022)
- SCTL-RMOII-Matrix (October 2021)
- Sampling Protocol for Petroleum Cleanup Projects Using In-Situ Activated Carbon Injections (July 19, 2022)
- NAM Procedures and Technical Guidance – December 2022
Source Removal
- Executive Summary of Source Removal Guidance for Preapproval Program Sites (February 15, 2007)
- Preapproval Program Guidance for Technical and Cost Justification for Contaminated Soil Source Removal (February 15, 2007)
- Supplemental Guidance for 62-770.300 Interim Source Removal (February 15, 2007)
- Backfill Sampling Procedures (October 01, 2010)
- Supplement to Milestone Policy - "Time to Switch" Evaluation Procedure (September 6, 2001)
- Transportation and Disposal of Additional Soils (September 13, 2017)
Remediation Forms
- Petroleum Restoration Program O&M Inspection Form (February 25, 2004)
- Petroleum Restoration Program Cleanup Milestone Workbook (April 15, 2011)
- Petroleum Restoration Program Cleanup Milestone Workbook Example (April 15, 2011)
- This updated and simplified Excel version 97-03 workbook calculates and plots linear cleanup target milestones vs. actual performance and is tailored to meet the Petroleum Restoration Program Remedial Action Initiative directive. A completed example workbook is included for illustration purposes.
- Petroleum Restoration Program Natural Attenuation Monitoring Plan Checklist
- Petroleum Restoration Program Natural Attenuation Monitoring Report Checklist
- LTNAM Reduction Worksheet
- Alternative SCTL Calculation Spreadsheet
Return to: Procedures & Guidance Documents page.
Return to: SOP Site Manager Remediation Guide page.
Return to:SOP Site Manager Guide webpage.
Last Modified: Friday, Jun 05, 2026 - 12:28pm